JUNE 12 QMR MEETING

REVIEWED ITEMS FROM MAY’S MEETING

TALKED ABOUT TANK VENT TEST STAND STILL UNDER BENCHMARKING PROTECTOSEAL WILL BE HELPING.TEST PROCEDURE IS GOOD, PROTECTOSEAL RECOMMENDS FLOW @ 1 SCFH FOR ALL VALVES AND HOLD AT 90% VERSE API 75% AND API2000 HAD VARIOUS FLOW RATES DEPENDING ON SIZE.

PROTECTOSEAL RECOMMENDS NO LEAK CHECK ON VACUUM, DUE TO WE DON’T HAVE PRESSURE ON THE VALVE AND VACUUM IS TIGHTER WHEN IN SERVICE.

TALKED ABOUT OUR TRAINING.GTC LEVEL II WILL BE JULY 23RD THROUGH AUG 1ST WITH JIM CRAMER IN CHATTANOOGA, NEED EVT PRO AND NOZZLE CUTTER WITH # 4 CUTTING HEAD.

TALKED ABOUT C&K LEVEL I, SCHEDULED JULY 29TH THROUGH AUG. 2ND

TALKED ABOUT AND FINIALIZED JUST USING VALV-KEEP FOR ALD HYDRO SET REPORTS.ROGER WILL FIX VALV-KEEP TO MAKE SURE WE CAPTURE HYDRAULIC PRESSURE, CONSTANT AND INLET PRESSURE, FINAL RESULTS WILL GO IN THE REPORT LIKE NORMAL.

JOHN D.TALKED ABOUT OUR TRAINING WE NEED TO DO FOR OSHA BY THE END OF JUNE.AND WE WILL START IN JULY DOING ONLINE SAFETY TRAINING ABOUT 30 MIN, 1 HR ONCE A MONTH.

SHOPS ARE ALSO LOOKING BETTER TAKING CARE OF SAFETY CONCERNS FROM JOHNS AUDITS

DANNY CONKLE BROUGHT UP THE 1900 CONVERSIONS WILL SOON BE IN STOCK TO CONVERT 1900 TO 2900 IN THE EVENT GALLING ON GUIDE AND DISC HOLDER.TECHNICIANS NEED TO BE AWARE OF THIS AS FAR AS SHOP AND FIELD REPAIRS.SOLVE CUSTOMERS PROBLEMS

DANNY TALKED ABOUT EG112A REVISION